case-studies-header

Home » Case Studies

Case Studies

Shawfair Energy Centre

We recently completed the successful specification and delivery of 300,000 litres of bespoke buffer tank storage to the state-of-the-art Shawfair low-carbon district heating system. The three 100,000 litre tanks have been installed ready to serve local homes and businesses.

 

30,000L Specialist Storage Tank for AI Data Centre in France

Our team recently completed the manufacture and delivery of a bespoke 30,000-litre buffer tank to Data One Grenoble, a next-generation data centre development in the Isère region of France. This tank forms part of the critical thermal management system within a facility set to launch with 15 MW of IT capacity and scale rapidly to 400 MW over the next two years. 

 

Twelve Bespoke 2,000L Vessels for Twyford Abbey

We recently supplied 12 bespoke 2,000L vessels for the prestigious Twyford Abbey residential redevelopment project by Allford Hall Monaghan Morris (AHMM). The project required a tailored thermal storage solution that met strict plant room specifications while accommodating challenging site logistics.

264,000l of CHW Buffer Storage for a German Data Centre

Our team recently delivered four 66,000-litre vertical buffer tanks to a new state-of-the-art data centre in Frankfurt. The facility provides 22 MW of IT power across 11,560 sqm (124,431 sq ft) of customisable technical space, with each suite designed to meet specific client needs.

 

Thermal Storage with Reflex Storatherm for a Commercial ASHP

Mibec supplied four Storatherm buffer tanks to Revoe Learning Academy in Blackpool as part of their decarbonisation efforts. Delivered by Woodburn Renewable, the project involved the installation of two 480 kW heat pumps designed to provide efficient, low-carbon heating to the school. 

 

160,000l of CHW Buffer Storage for East End Data Centre 

A crucial aspect of maintaining optimal performance in data centres is effectively managing thermal loads to prevent overheating, which can lead to equipment failure and service interruptions. Our team successfully delivered four 40,000-litre horizontal buffer tanks to this project in the East End of London, showcasing our capability to handle large-scale operations. 

 

Basement and Roof Bespoke Buffer Tanks for a Transformation Project 

We recently supplied several bespoke tanks for a high-specification commercial redevelopment to provide specialist thermal storage solutions for both the basement and rooftop levels. 

 

Two Bespoke Buffer Tanks Supporting the Nelson & Colne College Group’s Ambitious Decarbonisation Programme 

We recently supplied two 15,000L bespoke buffer tanks to the Nelson & Colne College Group as part of its ambitious decarbonisation goals. The College is committed to becoming one of the first further education colleges in the country to achieve carbon neutrality by 2035. 

 

South Caernarfon Creameries

We worked closely with the client to design this innovative 40,000 litre tank which is now on site at an award-winning creamery in Wales. We combined our tank knowledge with the client's refrigeration expertise to design a unique chilled water tank solution that ensures the creamery has a reliable large-scale chilling system.

 

Bespoke Tank for a College Decarbonisation Project

We recently provided a 25,000L bespoke buffer tank to a College in North Devon as part of a significant decarbonisation project. The College project includes upgrades to the heating system plant and infrastructure, additional solar PV installation, and the delivery of an air source heat pump system, which Lorne Stewart PLC undertook. 

 

Nine Elms

For this major development, part of the transformational regeneration at Nine Elms in South West London, we needed to design and deliver buffer tanks for low-temperature hot and chilled water. This resulted in the manufacturing and delivery of four bespoke LTHW buffers and two chilled water tanks.

 

Bespoke Calorifier

Mibec recently provided a bespoke stainless steel calorifier to a commercial aircraft maintenance facility. The facility requires a large amount of water at the right temperature to clean planes efficiently and safely under all weather conditions.

 

Newcastle Civic Centre

At the initial project stages, the customer identified the need for a 10,000L tank for the HVAC system. However, our team undertook a site survey and identified access challenges for a tank that size. We worked closely with the client to design two identical 5,000L tanks that could deliver the thermal storage volume for the project within the restricted space available.